Checklist template

Retail KPI

A ready-to-use checklist with 31 items in 5 sections, covering Conversion & Traffic Infrastructure, Basket Size (UPT/ATV) & Merchandising, Inventory Health, Yield & GMROI, Omni-Channel & BOPIS Metrics, Labor Efficiency & Front-End Speed. Use it as-is in InspectLoop, or adapt it to your own standards in minutes.

  • 5 Sections
  • 31 Items
  • 25 Yes / No checks
  • 5 Scored ratings
  • 279 Points

Use this template How audits work

1. Conversion & Traffic Infrastructure 6 items

  1. Are the overhead foot-traffic counters functional, clear of dust, and unobstructed by hanging signage? Yes / No 10 pts
  2. Are employee "go-backs," breaks, and test-walks strictly logged to avoid inflating traffic data? Yes / No 9 pts
  3. Is the active daily conversion goal written on the backroom huddle board and communicated to all staff? Yes / No 9 pts
  4. Are floor schedules aligned precisely with historical peak traffic hours to maximize conversion opportunities? Yes / No 10 pts
  5. Do associates demonstrate the ability to pull real-time traffic or conversion data from store tablets? Yes / No 8 pts
  6. Traffic & Conversion Readiness: Rating
    • Data-Driven & Ready 10 pts
    • Minor Traffic Counter Lag 5 pts
    • Blind Operation/No Metrics 0 pts

2. Basket Size (UPT/ATV) & Merchandising 6 items

  1. Are high-margin cross-merchandising items (accessories, batteries, add-ons) placed within arm's reach of core displays? Yes / No 9 pts
  2. Are impulse-buy fixtures at the cash wrap fully stocked, front-faced, and priced correctly to drive ATV? Yes / No 8 pts
  3. Did observed associates pitch a minimum of one complementary item to customers on the sales floor? Yes / No 10 pts
  4. Are clear promotions (e.g., "Buy 2, Get 1") clearly signed to encourage multi-unit transactions (UPT)? Yes / No 9 pts
  5. Is the clearance or markdown section organized neatly to protect full-price average unit retail (AUR) sightlines? Yes / No 8 pts
  6. Basket Building Execution: Rating
    • Maximizing Every Ticket 10 pts
    • Passive Add-On Culture 5 pts
    • Transactional Only 0 pts

3. Inventory Health, Yield & GMROI 6 items

  1. Are daily cycle counts completed and transmitted before opening to maintain stock ledger accuracy? Yes / No 10 pts
  2. Is the out-of-stock (OOS) rate for top-50 volume items below the corporate threshold (typically <2%)? Yes / No 10 pts
  3. Are unworked freight pallets or delivery totes cleared from the floor within the mandated turnaround window? Yes / No 9 pts
  4. Is damaged, defective, or customer-returned product processed daily to minimize stagnant asset hold times? Yes / No 9 pts
  5. Are electronic shelf labels (ESLs) or price tags 100% accurate, eliminating price overrides at checkout? Yes / No 10 pts
  6. Inventory Velocity Control: Rating
    • High-Velocity Precision 10 pts
    • Stockroom Backlog Present 5 pts
    • High Shrink/OOS Exposure 0 pts

4. Omni-Channel & BOPIS Metrics 6 items

  1. Is the dedicated Buy Online, Pick Up In Store (BOPIS) staging area organized numerically or alphabetically? Yes / No 9 pts
  2. Are inbound digital orders picked, packed, and staged within the corporate 30-minute SLA? Yes / No 10 pts
  3. Are aged digital orders (unclaimed over 7 days) systematically cancelled and returned to active floor stock? Yes / No 9 pts
  4. Do associates consistently pitch the brand's loyalty app during BOPIS pickups to bridge offline-online data? Yes / No 8 pts
  5. Is shipping and packaging material (branded boxes, tape, void fill) fully stocked at the fulfillment station? Yes / No 8 pts
  6. Fulfillment Speed Efficiency: Rating
    • Seamless Omnichannel Flow 10 pts
    • Picking/Staging Bottlenecks 5 pts
    • Fragmented Operation 0 pts

5. Labor Efficiency & Front-End Speed 7 items

  1. Is the store's labor-cost-to-sales ratio matching or beating the weekly corporate target budget? Yes / No 10 pts
  2. Is a dynamic cross-training matrix utilized so floor staff can instantly support checkout when lines form? Yes / No 9 pts
  3. Is the average customer checkout wait time kept under 3 minutes during peak traffic surges? Yes / No 9 pts
  4. Are POS exception logs (voids, heavy manager discounts, post-voids) reviewed daily by management? Yes / No 10 pts
  5. Are employee hours, shift adjustments, and punches verified and finalized daily in the workforce management system? Yes / No 9 pts
  6. Operational Throughput: Rating
    • High Efficiency Level 10 pts
    • Minor Front-End Friction 5 pts
    • Uncontrolled Labor Spend 0 pts
  7. Final summary Comments

Brand standards

At every site, every time